TAK Communications is a leading national telecommunications and broadband service provider that offers full value chain communications services and solutions to its customers across the US, from project management, engineering, and construction to drops, fulfilment and door-to-door sales in over 40 states. TAK Communications prides itself on being a trusted business partner for its customers in the broadband and communications sector, providing solutions that exceed their expectations.
We are seeking a highly skilled Project Manager, Data Center Construction to join our team in Sioux Falls, SD. The Project Manager will lead the design and construction of data center projects, ensuring the successful delivery of high-quality data centers within scope, time, and budget to meet our customer’s needs.
Why TAK?
Full TimePaid WeeklyFull Benefits Package (Medical, Dental & Vision)Paid Time Off401(k) with Company Match!25K Company Paid Life InsuranceIndependent Work & Team CollaborationCareer Development & Advancement Opportunities!The Role
Leads the design process for data center facilities, ensuring designs align with industry standards, operational needs, and project requirementsCollaborates with design engineers, architects, and IT specialists to create optimal layouts for power, cooling, networking, and security systems, ensuring project scope align with data center operational requirementsReviews and approves design plans, blueprints, and technical drawings, ensuring designs meet scalability, redundancy, and energy efficiency requirementsOversees all phases of data center construction from initial design through completionManages relationships with contractors, subcontractors, vendors, and other stakeholders to ensure that construction and design specifications are accurately followedEnsures adherence to safety standards, building codes, and data center operational requirementsParticipates in the Request for Quotation (RFQ) process by providing technical input, assisting with cost estimation, and ensuring all relevant elements are accurately represented in bids and proposalsIdentifies potential risks, develops mitigation strategies, and monitors the project to minimize disruptionsMaintains detailed documentation of the design process, construction progress, compliance reports, and any changes in project scopeAddresses and resolves project issues as they arise, ensuring minimal disruption to project timelines and objectivesOversees final inspections, ensuring all items are completed prior to project hand-offOther duties as assigned Requirements 5+ of years of experience in construction project management, engineering, or architecture, with a strong preference for experience in data center constructionBachelor’s degree in Architecture, Engineering, Construction Management, or a related field; relevant certifications (e.g., LEED, PMP, OSHA) are a plusIn-depth knowledge of data center design principles and infrastructure, including mechanical, electrical, and HVAC systemsProficiency with construction management software and project scheduling toolsStrong organizational and multitasking skills, excellent communication and leadership abilities, problem-solving skills, and attention to detailAbility to manage multiple projects and coordinate complex design and construction activities simultaneouslyStrong proficiency in design software (e.g., AutoCAD, Revit) and construction management toolsExcellent organizational, project management, and negotiation skillsKnowledge of safety standards and building codes (e.g., OSHA, NFPA, TIA-942)Strong analytical and financial acumenTravel +/- 50% annuallyValid driver’s licensePassing of all pre-employment requirements (MVR, Background Check, Drug Screen)
Equal Employment Opportunity (EEO) Employer
All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or status as a protected veteran.
Salary Description $100 - $150K base annually, DOE