Engineering Intern
Overhead Door Corporation
Redoing the Megamation equipment list to tie Work Orders to specific machines to track maintenance labor costs. Align Oracle Asset Tag numbers for the production equipment to the equipment list in Megamation. Entering Preventative Maintenance schedules for all plant equipment into Megamation so the system automatically creates Work Orders to complete PM tasks. Update the Plant Layout AutoCAD file to current layout including equipment Asset Tag information, IT Network drops, and surveillance camera locations.
Confirm your E-mail: Send Email
All Jobs from Overhead Door Corporation