General Laborer
Alutiiq
General Laborer Yokosuka Provisions
LOAD/STOW SUBSISTENCE AND SUPPLIES.
The contractor shall transport all subsistence items and supplies from the staging area to designated location onboard the ship, using daisy chain and or dolly/cart/conveyor methods. The contractor shall provide limited stock rotation and or provisions relocation with-in ships storerooms in order to allow proper stowage of ships provisions. The Contractor will clean up any debris created from transporting of stores. All items shall be neatly stowed in accordance with technical direction as provided by the Jack-Of-The Dust or Customer Representative. The Jack–Of-The-Dust or other ship’s representative will verify receipt document matches provisions received and quantity. The contractor shall stack empty pallets in a central location on the hangar bay or pier. The contractor shall remove all debris from work areas. The Government (Ships force) is responsible for storeroom preparation. Material stowed accurately in accordance with technical as provided by the Customer Representative or the Jack-In-The-Dust. Material loaded and stowed with-in scheduled time frames as specified in the advance schedule. Professional appearance and good personal hygiene of contractor personnel. Security procedures are followed as provided by U.S. Navy and local port Operations. No damage occurred during load and stowage procedures.
Confirm your E-mail: Send Email
All Jobs from Alutiiq