ABERDEEN, United Kingdom
32 days ago
Senior Instrument Designer

Petrofac is seeking a Senior Instrument Designer - Contractor for 12 months based in Aberdeen, UK.

The role is outside IR35 and we invite Limited Companies to engage.

Scope of Services:

Provide design input to estimates for project work scopes  Provide technical design expertise to specify modifications to existing equipment or purchasing new equipment including:

 

DCS, ESD F&G and Metering system modifications Field Instrumentation including Pressure, Level, Temperature, Flow and Specialist Measurements. Valves SIL, High Integrity Systems (HIPPS) Measurement and Metering Industrial Networking and Communications

 

Provide technical design expertise to the resolution of technical queries ensuring that all design changes are captured by the change control process  To be able to conduct site surveys on offshore or onshore assets  To be able to produce calculations required for the role and participate in design reviews.   Production of discipline documentation deliverables for inclusion in work packs.   Provide a level of technical support that satisfies the appropriate Asset Safety Case and that the PFEER performance standards ensuring they are not compromised by any discipline engineering activities Compliance with company engineering procedures, industry, international and client codes and standards.   Ensure that all work complies with the Contract Health, Safety, Environmental and Quality policies and procedures as appropriate.  

 

Deliverables:

Block Diagrams or Single line diagrams   Cause & Effect Diagrams  Instrument Cable Block Diagram   Cable Tray Routing & Layout Diagrams    Panel; Control Room; F&G and Equipment Room Layouts   Panel Wiring Diagram  Destruct Drawing   Instrument Mounting / Support Details  Logic & Loop Diagrams  Schematic Diagrams   Cable Interconnection Diagrams   Cable; Panel & Junction box Termination Diagram   Junction Box Termination Diagram   Pneumatic; Chemical and Hydraulic Hook-up Diagram   Pneumatic; Chemical and Hydraulic Hook-up Schematic  Installation or story board diagrams to facilitate understanding    Cable Schedule   Requisition - Bulk Bill of Materials 

 

#LI-JN1

 

Additional Information
Confirm your E-mail: Send Email